Installation O peration and Maintenance Manual - Siel Invest
Pre-installed or separate, depending on the ordered configuration. Document and Hardware Kit Anchor bolts (typically M10 or M12 expansion anchors). Alignment jigs/templates. Synchronization communication cables. System keys for side panels and top lids. 3. Step-by-Step Installation Procedure Step 1: Layout and Marking
Wings detect resistance, reverse immediately, and trigger a warning. Cut the primary AC power supply. Emergency failsafe mechanism engages; wings open freely. 6. Preventive Maintenance Guidelines gunnebo speedstile fl installation manual
The SpeedStile FL operates on a universal mains input (
This public link is valid for 7 days and shares a thread, including any personal information you added. This link or copies made by others cannot be deleted. If you share with third parties, their policies apply. Can’t copy the link right now. Try again later. Installation O peration and Maintenance Manual - Siel
: Use concrete with a minimum resistance of 30N/mm² .
Tighten the clamping bolts evenly in a cross pattern to a torque of Synchronization communication cables
The primary strength of the Gunnebo Speedstile FL Installation Manual lies in its structural approach to site preparation. Unlike simpler security devices, optical turnstiles are integrated systems requiring harmony between the physical floor, the electrical infrastructure, and the logical flow of human traffic. The manual dedicates significant attention to the "pre-installation" phase, outlining specific requirements for cable routing, floor flatness, and drainage.
Prepare a dry contact signal line from the building's fire alarm system for emergency failsafe opening. 2. Unboxing and Component Inspection
, comprehensive site preparation is necessary. The unit must be installed on a finished, flat, and level floor to ensure the glass panels operate smoothly and align correctly Structural Integrity:
Cables must rise from the foundation into the designated shaded areas within the cabinet base. Conduit Depth : Conduits should run at least 140mm below finished floor level. Conduit Rise : Conduits must rise at least 50mm from the foundation to prevent water ingress. Conduit Diameter : Use a minimum diameter of Power Supply : Standard operation requires 230Vac / 50Hz (115Vac available as an option). Power rating is roughly 120VA on standby 300VA during operation Fichet Security Solution 3. Installation Steps Gunnebo SpeedStile FLS Installation Guide | PDF - Scribd