Lenel Lnl3300m5 Installation Manual Upd Top Jun 2026

Download the database to the panel to finalize the online status. 6. LED Status Indicators and Troubleshooting

The M5 supports . Top-level programmers can script events:

Utilize Port 2 (RS-485) for connecting downstream modules (Input/Output boards, Reader interfaces). lenel lnl3300m5 installation manual upd top

Reader interface connection (Wiegand, Magnetic Stripe, or RS-485 readers). 🔌 Wiring and Connections

Navigate to the Network Settings tab, disable DHCP, and input your assigned , Subnet Mask , and Default Gateway . Save the configuration and reboot the controller. OnGuard Software Integration Launch OnGuard System Administration . Navigate to Access Control > Access Panels . Click Add to create a new panel record. Select LNL-3300 or LNL-3300-M5 as the Panel Type. Download the database to the panel to finalize

(62 pages, including wiring diagrams, mechanical drawings, and OSDP command reference), download from the LenelS2 Partner Portal (Document # LNL-3300-M5-IM-D 2025-A) or contact technical support. Always refer to the latest revision before installation.

Label all downstream RS-485 communication wires, tamper switch wires, and power lines connected to the legacy CPU. Top-level programmers can script events: Utilize Port 2

For downstream controllers lacking these inputs (like the LNL-8000-MCOM), integrators must wire these switches to available inputs on an LNL-1100-20DI board or reader port inputs.

All wiring must comply with National Electrical Codes (NEC) as well as local jurisdictional regulations. 1. Power Supply Wiring (TB1) Connect a clean, filtered 12–24 VDC power source to TB1. VIN (+ VDC) TB1-2: GND (0 VDC) 2. Downstream RS-485 Communication (TB1)

Connect a crossover or standard Ethernet cable between the controller and your PC, then power on the unit. Web Access: Open a browser and navigate to