Nokia 7250 Ixr X1 Installation Guide [portable] – Verified & Direct

Follow local electrical codes and guidelines for grounding equipment. 2. Unboxing and Hardware Overview

100V to 240V AC, 50-60Hz. Dedicated circuit breakers are highly recommended. DC Power (Optional Variant): -40V to -72V DC.

+-------------------------------------------------------------+ | [ Power Supply 1 ] [ Power Supply 2 ] [ Fan Tray 1 ] | | [ AC / DC ] [ AC / DC ] [ Hot-Swappable] | +-------------------------------------------------------------+ Installing Fan Trays nokia 7250 ixr x1 installation guide

Operating temperature must stay between 32°F to 104°F (0°C to 40°C) with non-condensing humidity between 5% and 95%. Tools and Equipment Required Phillips #1 and #2 screwdrivers Mechanical lift (optional, for high rack placements) ESD (Electrostatic Discharge) grounding wrist strap Digital multimeter (to verify input voltage)

Nokia markets the IXR-X1 as a "data center interconnect and aggregation router." In human speak: This is the bouncer at the club. It sits between your hyperscale compute and the outside world, deciding who gets in and out at 400GE speeds. Follow local electrical codes and guidelines for grounding

Position the left and right mounting ears against the side screw holes at the front or mid-section of the router.

Connect the provided RJ-45 to DB-9 console cable to the port labeled CONSOLE or MGMT on the front panel. Connect the other end to your terminal server or management laptop. Dedicated circuit breakers are highly recommended

Put on an ESD wrist strap and connect it to an earth ground. Remove the chassis from the antistatic shipping bag. Inventory Components: Verify that the package contains: Nokia 7250 IXR-X1 chassis Rack-mounting bracket kit Two Power Supply Units (pre-installed or separate) Fan tray modules Accessory kit (grounding lug, screws, console cable) 3. Mechanical Mounting Procedures